ORBITAL 轨道桥
UTC --:--:--

Launch and sites

计划发射时间
NET (No Earlier Than)

The earliest possible launch time — it usually moves.

Every countdown here is NET-based, with the snapshot time shown.

Related terms
  • Fairing size — The diameter and usable volume of the fairing.
  • Pad turnaround — Time to reset a pad between flights.
  • Weather criteria — The weather rules a launch must satisfy.
  • Range — The ground corridor the rocket overflies, kept clear.

← glossary